Jun 05, 2023
Main Gear
- (2 hours)
Category: Landing Gear
Hoisted front of fuselage to take weight off gear legs. Removed both AN 5 bolts from main gear leg attachments. Straightened plastic rub strip (it was not aligned properly during initial installation- my error). Replaced all 4 AN5 boltsnuts with new and retorqued to build manual values. Applied torque seal to nuts. Retorqued both AN6 main bolts.